6.7 Information on forbidden use

be installed and used only by personnel
qualified and authorised according to the
manufacturer's instructions. The generating
set must be used only and exclusively to pro-
duce electrical power on vehicles provided
with an electrical system made according to
standards and depending on the quantity of
power delivered.

6.8 Useful tips

During the running-in period, do not subject the
new engine to a load higher than 70% of the
rated load, at least for the first 50 running hours.

7 MAINTENANCE INSTRUCTIONS

parts. The use of spare parts of non-
equivalent quality may damage the generat-
ing set. Periodical control and adjustments
are of the essence in preserving a high level
of performance. Routine maintenance also
ensures long generating set life.
check or maintenance operation on the gen-
erating set, turn the ON/OFF switch of the
control panel to the OFF position and the
AUTO/MAN switch of the control panel to the
MAN position.
ROUTINE MAINTENANCE SCHEDULE
To be performed after the period of time or the number
of running hours listed here, whichever the earlier may
be.
Engine oil
Air filter
Spark plug
Valve adjustment
Tank and fuel filter.
Engine r.p.m.'s or frequency
Vibration damper suspension points
Fuel pipes
NOTES: (1) Clean more frequently if you use it in a very dusty environment.
(2) These operations must be performed by specialised personnel only
Vers. 001
The generating set must
Use only original spare
Before performing any
Inspection
Change
Cleaning
Inspection-cleaning
Check-adjust
Cleaning
Adjust
Check
Check (replace if
necessary)
GB
Then disconnect the red 12 Vdc cable from
the terminal (Fig. 10 Ref. 1)
This way you can operate under safe condi-
tions as the generating set cannot start up.

7.1 Maintenance schedule

See the table at the bottom of the page.
7.2
Maintenance not requiring skilled per-
sonnel
To perform this kind of check, it will be necessary
to open the door of the generating set. The fol-
lowing precautions must therefore be taken:
1 The generating set must not be running, and
all its parts must be cold.
1 Let the generating set cool off.
Every use
Energy 8012 G
Every
Every 6
month or
month or
20 h
100 h
● (2)
● (2)
(1) ● (2)
● (2)
● (2)
Every two years
Every ye-
ar or 300
h
● (2)
● (2)
● (2)
17