Midea MOBA30U-12HN1-Q Service Manual page 213

Hide thumbs Also See for MOBA30U-12HN1-Q:
Table of Contents

Advertisement

3.6.3 Install the pendant bolt
3.6.3
Install the pendant bolt
Install the pendant bolt
① Ceiling installation
Ceiling installation
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four
holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
expansible hooks (fittings).
expansible hooks (fittings).
expansible hooks (fittings).
expansible hooks (fittings).
② Wall-mounted installation
mounted installation
mounted installation
Install the tapping screws onto the wall.(Refer to picture below)
Install the tapping screws onto the wall.(Refer to picture below)
Install the tapping screws onto the wall.(Refer to picture below)
Install the tapping screws onto the wall.(Refer to picture below)
Install the tapping screws onto the wall.(Refer to picture below)
Install the tapping screws onto the wall.(Refer to picture below)
Install the tapping screws onto the wall.(Refer to picture below)
3.6.4
3.6.4 Install the main bod
Install the main bod
Install the main body
① Ceiling installation (The only installation method for the unit with drain pump)
Ceiling installation (The only installation method for the unit with drain pump)
Ceiling installation (The only installation method for the unit with drain pump)
Ceiling installation (The only installation method for the unit with drain pump)
Ceiling installation (The only installation method for the unit with drain pump)
Ceiling installation (The only installation method for the unit with drain pump)
Ceiling installation (The only installation method for the unit with drain pump)
Remove the side board and the grille.
Remove the side board and the grille.
Remove the side board and the grille.
Remove the side board and the grille.
Remove the side board and the grille.
Installation
Installation
Indoor unit installation
Indoor unit installation
Indoor unit installation
209
209

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mca3-12hrn1-qMue-12hrn1-qMtb-12hwn1-qMoba30u-18hn1-qMca3-18hrn1-qMue-18hrn1-q ... Show all

Table of Contents