Face the concave side of the installation hooks toward the expansible hooks. Determine the length of the
Face the concave side of the installation hooks toward the expansible hooks. Determine the length of the
Face the concave side of the installation hooks toward the expansible hooks. Determine the length of the
Face the concave side of the installation hooks toward the expansible hooks. Determine the length of the
Face the concave side of the installation hooks toward the expansible hooks. Determine the length of the
Face the concave side of the installation hooks toward the expansible hooks. Determine the length of the
Face the concave side of the installation hooks toward the expansible hooks. Determine the length of the
Face the concave side of the installation hooks toward the expansible hooks. Determine the length of the
Face the concave side of the installation hooks toward the expansible hooks. Determine the length of the
Face the concave side of the installation hooks toward the expansible hooks. Determine the length of the
Face the concave side of the installation hooks toward the expansible hooks. Determine the length of the
installation hooks from the height of ceiling,
installation hooks from the height of ceiling,
installation hooks from the height of ceiling,
installation hooks from the height of ceiling,
installation hooks from the height of ceiling, then cut off the unnecessary part.
If the ceiling is extremely high, please determine the length of the installation hook depending on the real
If the ceiling is extremely high, please determine the length of the installation hook depending on the real
If the ceiling is extremely high, please determine the length of the installation hook depending on the real
If the ceiling is extremely high, please determine the length of the installation hook depending on the real
If the ceiling is extremely high, please determine the length of the installation hook depending on the real
If the ceiling is extremely high, please determine the length of the installation hook depending on the real
If the ceiling is extremely high, please determine the length of the installation hook depending on the real
If the ceiling is extremely high, please determine the length of the installation hook depending on the real
If the ceiling is extremely high, please determine the length of the installation hook depending on the real
If the ceiling is extremely high, please determine the length of the installation hook depending on the real
If the ceiling is extremely high, please determine the length of the installation hook depending on the real
situation.
situation.
3.1.4 Install the main body
3.1.4
Install the main body
Install the main body
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adju
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adju
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adju
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adju
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adju
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adju
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adju
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the levelness of the main body is within ±1°.
the levelness of the main body is within ±1°.
the levelness of the main body is within ±1°.
the levelness of the main body is within ±1°.
the levelness of the main body is within ±1°.
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The body's
Adjust the position to ensure the gaps between the
Adjust the position to ensure the gaps between the
Adjust the position to ensure the gaps between the
Adjust the position to ensure the gaps between the
Adjust the position to ensure the gaps between the
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of the
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of the
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of the
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of the
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of the
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of the
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of the
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of the
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of the
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of the
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of the
installation hook.
installation hook.
installation hook.
Locate the air conditioner firmly by wrenching the nuts after having adjust
Locate the air conditioner firmly by wrenching the nuts after having adjusted the body's position well.
Locate the air conditioner firmly by wrenching the nuts after having adjust
Locate the air conditioner firmly by wrenching the nuts after having adjust
Locate the air conditioner firmly by wrenching the nuts after having adjust
Locate the air conditioner firmly by wrenching the nuts after having adjust
Locate the air conditioner firmly by wrenching the nuts after having adjust
Locate the air conditioner firmly by wrenching the nuts after having adjust
Installation
Installation
then cut off the unnecessary part.
then cut off the unnecessary part.
then cut off the unnecessary part.
body and the four sides of ceiling are even. The body's
body and the four sides of ceiling are even. The body's
body and the four sides of ceiling are even. The body's
body and the four sides of ceiling are even. The body's
body and the four sides of ceiling are even. The body's
Indoor unit installation
Indoor unit installation
Indoor unit installation
st the hexangular nuts on
st the hexangular nuts on
st the hexangular nuts on
ed the body's position well.
ed the body's position well.
193
193

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mca3-12hrn1-qMue-12hrn1-qMtb-12hwn1-qMoba30u-18hn1-qMca3-18hrn1-qMue-18hrn1-q ... Show all

Table of Contents