Indoor unit installation
Indoor unit installation
Indoor unit installation
Capacity (KBtu)
Capacity (KBtu)
9/12
30/36
30/36
48/60
48/60
3.3.3 Install the pendant bolt
3.3
.3 Install the pendant bolt
.3 Install the pendant bolt
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
expansible hooks (fittings).
expansible hooks (fittings).
expansible hooks (fittings).
expansible hooks (fittings).
3
3.3.4 Install the main body
.4 Install the main body
.4 Install the main body
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
the four installation hooks evenly, to ensure the balance of the body. Use a leveling
the four installation hooks evenly, to ensure the balance of the body. Use a leveling
the four installation hooks evenly, to ensure the balance of the body. Use a leveling
the four installation hooks evenly, to ensure the balance of the body. Use a leveling
the four installation hooks evenly, to ensure the balance of the body. Use a leveling
the four installation hooks evenly, to ensure the balance of the body. Use a leveling
the four installation hooks evenly, to ensure the balance of the body. Use a leveling
the four installation hooks evenly, to ensure the balance of the body. Use a leveling
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the levelness of the main body is within ±1°.
the levelness of the main body is within ±1°.
the levelness of the main body is within ±1°.
the levelness of the main body is within ±1°.
the levelness of the main body is within ±1°.
200
200
Size of outline dimension mounted plug
Size of outline dimension mounted plug
Size of outline dimension mounted plug
Size of outline dimension mounted plug
L
12
740
18
960
24
960
1180
1240
M
M
350
350
350
350
350
350
490
490
500
500
instrument to make sure
instrument to make sure
Installation
Installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mca3-12hrn1-qMue-12hrn1-qMtb-12hwn1-qMoba30u-18hn1-qMca3-18hrn1-qMue-18hrn1-q ... Show all

Table of Contents