Midea MOBA30U-12HN1-Q Service Manual page 200

Hide thumbs Also See for MOBA30U-12HN1-Q:
Table of Contents

Advertisement

Indoor unit installation
Indoor unit installation
Indoor unit installation
3.2.3 Install the
3.2.3
Install the pendant bolt
pendant bolt
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Select the position of installation hooks according to the hook holes positions showed in upper picture.
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
expansible hooks (fittings).
expansible hooks (fittings).
expansible hooks (fittings).
expansible hooks (fittings).
3.2.4
3.2.4 Install the main body
Install the main body
Install the main body
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the levelness of the
the levelness of the
the levelness of the main body is within ±1°.
main body is within ±1°.
main body is within ±1°.
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The body's
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The body's
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The body's
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The body's
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The body's
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The body's
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The body's
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The body's
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The body's
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The body's
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The body's
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of the
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of t
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of t
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of t
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of t
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of t
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of t
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of t
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of t
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of t
installation hook.
installation hook.
installation hook.
196
196
he
Installation
Installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mca3-12hrn1-qMue-12hrn1-qMtb-12hwn1-qMoba30u-18hn1-qMca3-18hrn1-qMue-18hrn1-q ... Show all

Table of Contents