Zoeller 1261-0001 Manual page 9

Sewage pump
Hide thumbs Also See for 1261-0001:
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION INSTRUCTIONS
13. Attach power supply cord to discharge pipe using
cable or zip ties (not included) to allow the float switch
to move freely.
14. Connect pump power supply cord to a receptacle
protected by a ground fault circuit interruptor (GFCI).
15. Fill the basin with water to check operation. The pump
will start when the water level has reached the switch
"on" level.
13
14
15
9
Cable or
Zip Ties
GFCI
protected
receptacle
On

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

955614

Table of Contents