Preparation For Shipping; Figure 8.1 Instrument Packing Details - Kahn HygroPort I.S. User Manual

Hygrometer
Table of Contents

Advertisement

HygroPort I.S. User's Manual
8

PREPARATION FOR SHIPPING

For shipping purposes the instrument should be packed into its original carton, the latter
providing the recommended degree of protection during transit.
To prepare the instrument for shipping, proceed as follows:
1.
Turn the instrument off and remove any connections to the Gas In and Gas Out
ports and any external transmitters connected to it.
2.
If installed, remove the instrument from its carrying case.
3.
Pack the instrument in its original case (1) as shown in Figure 8.1.
NOTE:
Any accessories should be packed in the box (4).
returning them for repair, it is not necessary to return any external
transmitters or the battery charger.
4.
Create a packing list detailing all equipment contained in the box, place it inside
the box and seal the box.
Figure 8.1
Issue 6, December 2019
3
2
Instrument packing details
47
Unless
4
1
Kahn Instruments

Advertisement

Table of Contents
loading

Table of Contents