Loading The Simatic S5 Program - Siemens SIMATIC S5 Manual

Ethernet communication (iso on tcp) between controllers
Hide thumbs Also See for SIMATIC S5:
Table of Contents

Advertisement

2 Engineering
No
.
(1) Set the "Type of the PG/PC interface" to "PNIE".
5.
(2) Select the network card of the local PG to which the S7-1500 is connected.
(3) Under "Connection to interface/subnet", select the "PNIE_2" interface of the
project.
(4) Then, start searching for nodes by clicking "Start search".
(5) Select the matching S7-1500 CPU that has been found and load the project into
the station by clicking "Load".
2.9.3

Loading the SIMATIC S5 program

Prerequisite
The instructions for commissioning always refer to a fully reset S5 station.
A prerequisite for commissioning and loading the SIMATIC S5 is that the STEP 5
V7 software and NCM COM 1430 TCP are installed on the engineering station.
The engineering station has to be connected to the CPU 944 via the RS232 cable.
The S5-CPU can be started after the program file has been loaded successfully to
the S5-CPU and after the connection configuration of the CP1430 TCP has been
made.
After startup of the SIMATIC S5-CPU and synchronization of the CP1430 TCP, the
corresponding example scenarios can be enabled or disabled by setting enable
signals via the corresponding memory bits (see
After having restarted the SIMATIC S5-CPU, the CPU and the CP1430 TCP
Note
should now change to the RUN mode (LED). If the CPU remains in the STOP
mode, the corresponding S5-CPU error messages have to be output (via STEP 5
"online" diagnoses USTACK/BSTACK).
Ethernet Communication (ISO on TCP) between SIMATIC S5 and
SIMATIC S7-1500 Controllers
Entry-ID: 109482475,
V1.2,
07/2019
Action
1
3
Table
2-24).
2
4
5
86

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic s7-1500Cp1543-1Cp1430 tcp

Table of Contents