Standard In-Sink-Erator Mountings - InSinkErator SS-50 Installation, Care & Use Manual

Commercial disposer
Hide thumbs Also See for SS-50:
Table of Contents

Advertisement

# 5 MOUNTING ASSEMBLY
Follow these instructions to install a #5 sink flange to a
standard 3 1/2 - 4 inch sink opening.
1. Unscrew the three backup screws (6) until they are
flush with the upper mounting flange (5) surface. Pry
the retainer ring (7) free from the strainer flange (2)
with a screwdriver and separate all mounting assembly
parts (2 - 7).
2. Form a 3/4" thick ring of top grade oil base putty
around the sink opening (use non-hardening putty).
Insert the strainer flange (2) into the sink opening and
press firmly in place. Clean away any excess putty.
3. From underneath the sink, place the strainer flange
gasket (3), backup flange (4) - flat side up, and upper
mounting flange (5) over the strainer flange and hold
them up to the sink. Snap the retainer ring (7) into the
groove on the strainer flange to hold the mounting
parts in place.
4. Tighten the three backup screws evenly until the backup
flange draws snugly against the underside of the sink
and the strainer flange is held securely in place.
5. Place the body flange (9 - lugs upward) over the lip of
the mounting flange (10) and fit the mounting gasket
(8) onto the lip.
6. Place the mounting gasket (11) on the disposer body
flange. Secure the mounting flange (10) to the disposer
body flange with six screws (12) provided.
7. Raise the disposer to the upper mounting flange (5) so
the body flange (9) is positioned with the lugs to the
right of the screws.
8. While supporting the disposer, turn the body flange (9)
to the right until all three lugs are engaged in the
mounting flange (5). Swivel the disposer to align the
discharge outlet with the drain trap. The disposer can
be turned 360 degrees.
9. Align the disposer to the plumbing connection and
insert the service wrench into the left side of a lug and
continue to turn the body flange to the right (approxi-
mately one quarter turn) until it locks onto the notches
on the upper mounting flange.
NOTE: Special mounting instructions are included in the
#5 Short Mounting Kit.

Standard In-Sink-Erator Mountings

(1) Stopper
(2) Strainer Flange
Sink*
(3) Strainer Flange
(4) Backup Flange
(5) Upper Mounting
(6) Backup Screw
(7) Retaining Ring
(8) Mounting Ring
(9) Body Flange
(10) Mounting
Flange
(11) Mounting
Gasket
Disposer Body
Flange*
(12) 1/4" Screw
* Not included as part of #5 mounting.
Figure 3: #5 Mounting Assembly
4
Gasket
Flange

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents