Download Print this page

Pepperl+Fuchs Hoffman 1001A Series Installation & Operation Manual page 21

Type y or z pressurization / purging kits
Hide thumbs Also See for Hoffman 1001A Series:

Advertisement

Drain the Protection System Regulator frequently and clean System with non-solvent cleaning agents only.
Calibrate the enclosure pressure indicator to 0 inches by venting the purge pressure reference port and the protected
enclosure to atmosphere and adjusting the calibration screw in the lower center portion of the indicator's face.
Fully open the enclosure pressure control regulator, to blow out any deposits around the tip of the valve and to ensure that
the enclosure protection vent is operating properly, then carefully readjust system according to the set-up procedure and
operating sequence on pages 17 and 18. Replace or tighten stem packing nut as required to prohibit stem packing leakage.
Carefully disassemble the enclosure protection vent by loosening the two bottom hex nuts that hold the unit together.
(Do not REMoVE Cap nUts on top oF VEnt BoDY)
Carefully clean the flapper valve and vent body seats with warm soap and water, being careful not to extend the vent valve
beyond its normal opening point, and being careful not to exert any stress on the valve hinge.
Examine the entire Protection System and the protected enclosure(s), and replace any defective parts during routine shutdown
of the protected enclosure(s). Parts are available from Pepperl+Fuchs on immediate notice as required.
Date
RSPSupply - 1-888-532-2706 - www.RSPSupply.com
http://www.RSPSupply.com/p-6798-Hoffman-A1001YZUMC2-Purging-Pressurization-System-10-CF.aspx
system Maintenance
Regular Maintenance
long-term Maintenance
MaIntEnanCE sCHEDUlE
Work performed
performed by
21
21

Advertisement

loading

This manual is also suitable for:

Hoffman 1001a-lps