Download Print this page

Pepperl+Fuchs Hoffman 1001A Series Installation & Operation Manual page 8

Type y or z pressurization / purging kits
Hide thumbs Also See for Hoffman 1001A Series:

Advertisement

the system should be mounted at EYE lEVEl.
Care must be taken to ensure the system and all
protruding components are clear of all enclosure
accesses (doors and covers) and conduit, pipe, tubing
or cable entries.
lH, RH, tM, BM and WM configurations are intended
for mounting adjacent to the protected enclosure.
lH, RH, tM & BM configurations are also suitable
for 2" schedule 40 pipe mounting. In addition, these
configurations can be accessorized with an ECK
(Enclosure Connection Kit). (see page 9)
surface mounting systems with ECK accessory
1. Verify dimensions of the System's mounting holes and
connection fittings in reference to the applicable drawing
on pages 10 and 11.
2. Upon confirmation of dimensions, transfer mounting
hole pattern from drawing to the intended surface.
3. Check for internal obstructions which could hinder bolt
fastening and protective gas flow, drill and ream the
mounting holes before mounting the system.
4. Remove locknuts on enclosure connection fittings.
5. Secure the system to the protected enclosure using one
(1) SMK-1 mounting kit or equivalent - four (4) 1/4" x
3/4" stainless steel bolts, nuts and lock washers.
6. Install the locknuts on the enclosure connection fittings
from inside of the protected enclosure, ensuring that
fittings seat directly against enclosure through the
system mounting plate flange.
FM and pM configurations are designed to mount through a panel cutout one (1) inch smaller than the overall
height and width of the system mounting plate, using clips and fasteners provided with the sMK-4 mounting
kit. this design feature eliminates the need to drill the system mounting bolt holes in the protected enclosure.
FM configurations are intended for mounting adjacent to the protected enclosure.
pM configurations are intended for mounting through a cutout in the protected enclosure surface.
1. Transfer panel cutout pattern to the intended
surface.
2. Check for obstructions which could prohibit bolt
fastening or system pneumatic connections.
3. Cut panel cutout pattern on the intended surface.
8 8
RSPSupply - 1-888-532-2706 - www.RSPSupply.com
http://www.RSPSupply.com/p-6798-Hoffman-A1001YZUMC2-Purging-Pressurization-System-10-CF.aspx
system Mounting
IMpoRtant notEs
Mounting lH, RH, tM, BM & WM Configurations
Mounting FM & pM Configurations
HElpFUl HInts
systems furnished with the ECK are not compatible for
pipe mounting or multiple enclosure applications.
Determine the mounting configuration of your system
using the diagrams on pages 10 & 11.
Remove and save the manila envelope (containing the
enclosure warning nameplate) which may be taped
to the outer surface of the mounting flange.
although all systems are factory tested and calibrated,
we strongly suggest a bench test of basic functions
prior to installation.
surface mounting systems without ECK accessory
1 . Transfer hole pattern of System mounting plate to
intended surface.
2. Check for obstructions hindering bolt fastening, drill and
ream the mounting holes before mounting the system.
3. Secure the system to the enclosure, or other mounting
surface, using one (1) SMK-1 mounting kit or equivalent
- four (4) 1/4" x 3/4" stainless steel bolts, nuts and lock
washers.
pipe mounting systems without ECK accessory
1. Locate 2" schedule 40 pipe, (vertical for LH & RH,
horizontal for TM & BM) within five (5) feet of protected
enclosure.
2. Ensure system is mounted in a true vertical position,
secure the system to pipe, using one (1) a PMK-1
mounting kit or equivalent - two (2) 1/4" x 2" stainless
steel "U" bolts, nuts and lock washers.
4. Deburr all cutout surfaces.
5. Secure system to enclosure using SMK-4 or SMK-6
mounting kit, or equivalent 1/4" x 3/4" stainless steel
nuts, bolts, mounting clips and lock washers.

Advertisement

loading

This manual is also suitable for:

Hoffman 1001a-lps