Alpha ESS SMILE-BAT-10.3P Installation Manual page 17

Battery module
Hide thumbs Also See for SMILE-BAT-10.3P:
Table of Contents

Advertisement

Your Smart Energy
Installation
M5*10 Screw
Step 2: Install the battery brackets on the battery with M5 screws.
Step 3: Please drill four holes (two on each side) directly on the wall at the marking
positions of the brackets with an impact drill (bit φ 8.0mm, length 20cm) and the depth of
each hole should be about 7 cm.
______________________________________________________________________
Alpha ESS Co., Ltd.
Page 15 of 42

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents