Download Print this page

Advertisement

Quick Links

QUICK INSTALLATION GUIDE
SMILE-BAT-10.1P/10.3P

Advertisement

loading

Summary of Contents for Alpha ESS SMILE-BAT-10.1P

  • Page 1 QUICK INSTALLATION GUIDE SMILE-BAT-10.1P/10.3P...
  • Page 2 6 x ST4.8*60 6 x M5*10 Screw Battery Communication Cable 2 x Mounting Panel Wall Anchor 4 x M6 Washer 1 x Documentation...
  • Page 3 Mount brackets on the battery Take out the battery from the packaging. Assemble the mounting panels on the battery. 2 x Mounting Panels Fix the battery Push the battery against the wall, cover the top of the battery with cardboard provided in the accessary and drill 4 holes on the wall with drill Φ8. Remove the cardboard and secure the battery to the wall with screws.
  • Page 4: Installation And Wiring

    Open maintenance window Open the front panel and remove the right side communication Battery circuit breaker maintenance window panel. Open the front panel of the farthest battery from the inverter and remove DIP baffle. Set the DIP switch 2 to “on” mode.
  • Page 5: Expansion Cable

    Expansion cable Connect the power cables from BAT2 to BAT1. Connect the communication cables from BAT2 to BAT1. Connect batteries first if more batteries are to be added. Close maintenance window Add extra batteries Close the DIP baffle and battery front panel. To install another battery repeat Steps 1~9 Turn ON the battery circuit breaker.
  • Page 6 Configuration with GoodWe Inverter If there are two or more than two BAT, after connecting the power cables, please refer to the following steps: Only connect the communication cable between batteries at the first, and turn on the batteries. Wait until batteries get to work mode (The green light flashes every 10 seconds) and then connect the communication cable between BAT and INV.

This manual is also suitable for:

Smile-bat-10.3p