Download Print this page

Oneida Air Systems Dust Deputy D.I.Y. Manual page 6

Cyclone separator

Advertisement

Assembly Instructions
Draw 3" diameter circle on your supplied lid. Carefully cut
1
out 3" hole in lid. Use 5/16" drill bit to drill bolt holes.
Note: Use the base of the Cyclone (A), Gasket (B), or the Dust
Deputy Template on page 17 for reference.
Turn Cyclone (A) upside-down. Place Gasket (B) on the
2
base of Cyclone (A) and align all the holes. Place the topside
of the supplied lid against Gasket (B) and align all the holes.
Secure Cyclone (A), Gasket (B) and lid together using six
Bolts (C1), six Washers (C2), and six Whiz-Lock Nuts (C3)
as shown in [FIG. 2].
Note: Thoroughly tighten hardware to eliminate air leaks.
6
Oneida Air Systems
FIG. 1
FIG. 2
C3
C2
C1

Advertisement

loading