Figure 5A Ducted Application; Figure 5B 3" Riser Application - Bard I-TEC Series Installation Instructions Manual

Packaged heat pump
Table of Contents

Advertisement

BOTTOM OF ROOF
OR FIXED CEILING
SUSPENDED
20"
CEILING
MINIMUM
7'-9 3/4"
UNIT HEIGHT
BOTTOM OF ROOF
OR FIXED CEILING
SUSPENDED
20"
CEILING
MINIMUM
7'-9 3/4"
UNIT HEIGHT
3" RISER
FIGURE 5A
Ducted Application – Basic Unit
12"
MINIMUM
4" MINIMUM FROM
TOP OF UNIT TO
DUCT BOTTOM
9'-7" MINIMUM
CLEARANCE
RECOMMENDED TO
BOTTOM OF ROOF
OR FIXED CEILING
FIGURE 5B
3" Riser Application
12"
MINIMUM
4" MINIMUM FROM
TOP OF UNIT TO
DUCT BOTTOM
9'-10" MINIMUM
CLEARANCE
RECOMMENDED TO
BOTTOM OF ROOF
OR FIXED CEILING
FIELD SUPPLIED DUCT
FLOOR
FIELD SUPPLIED DUCT
FLOOR
TURNING VANES
RECOMMENDED
9'-2"
MINIMUM
REQUIRED
INSTALLATION
HEIGHT
MIS-3198
TURNING VANES
RECOMMENDED
9'-5"
MINIMUM
REQUIRED
INSTALLATION
HEIGHT
MIS-3199
Manual 2100-578L
Page
13 of 42

Advertisement

Table of Contents
loading

This manual is also suitable for:

I36z1-aI36z1-bI36z1-cI48z1-aI48z1-bI48z1-c ... Show all

Table of Contents