Installation and Start
5. Repeat step 4 for all positions of clamping bracket.
8.2
Startup Procedure
To activate your C2 base/C2 pro/C2 marine Panel PC connect the power supply
to power connector on the C2 base/C2 pro/C2 marine back side. The LED
"PWR" gives a green light now.
Beijer, MAEN278
25
Need help?
Do you have a question about the C2 base and is the answer not in the manual?