Chapter 2 Preparing to install the OneCell system
Overview
This document describes the OneCell installation and includes:
•
•
•
Before installing the OneCell components
Before installing the OneCell components, the system integrator must plan the
network for the topology that will be deployed. See OneCell
Guide (M0300A1).
CommScope recommends that cables and switches be in place before installing the
OneCell components. See
guidelines
2-2
Chapter 3, Baseband Controller installation
Chapter 4, RP5100i installation
Chapter 5, RP5100r installation
for more information.
Appendix E, Cable installation and power separation
®
Network Planning
M0300A2
4.0.11
January 2020