Reference
1
2
3
4
5
6
7
8
Cart Assembly
1. Install the axle to the frame.
a. Carefully lift main welder frame approximately 12 inches off the ground. Be careful to
secure the unit to prevent it from falling.
Main Parts of 4500K
Subassembly
5 Gallon Fuel Tank
Auxiliary Power Circuit Breaker
120V Duplex Receptacle
240V Receptacle
Positive (+) Output Connection
Negative (-) Output Connection
Kohler CH395 Engine
Weld Output Control
Assembly Instructions
Page 12 of 27