Simrad ES38DD Installation Manual page 30

Split-beam transducer
Hide thumbs Also See for ES38DD:
Table of Contents

Advertisement

Simrad ES38DD Installation Manual
Pin configuration
Pin on
connector
1
4
2
5
3
6
7
8
It is very important that the transducer is correctly
installed with the sectors positioned as shown in the
illustration (seen from above). Each sector is connected
to a dedicated transceiver channel. In this context,
the phrase transceiver channel is used to describe one
single pathway through the transceiver. This pathway
contains one transmitter, one preamplifier and the necessary transmit/receive switching
circuitry.
Related topics
Cable layout and interconnections, page 26
28
Sectors
1 (+)
1 (-)
2 (+)
2 (-)
3 (+)
3 (-)
4 (+)
4 (-)
Pin on
GPT connector
H
J
E
F
C
D
A
B
341701/B

Advertisement

Table of Contents
loading

Table of Contents