Download Print this page

Siemens LOK16 Series Manual page 14

Burner controls
Hide thumbs Also See for LOK16 Series:

Advertisement

Detector current measurement (cont´d))
LGK16
Legend
14/28
Building Technologies Division
The measuring device must be connected between terminal 24 and the detector
electrode (+pole to terminal 24).
With ionization
DC 12...100 µA
+
24
A
7785v03/1008
Burner control
LGK16... base
1
1
2
2
5
22
3
23
4
15
A
Ammeter
RAR9...
Silicon photocell detector
ION
Ionization probe
ION
Terminals in
the control panel
Mains cable 3 x 1.5 mm
Single-wire coaxial cable
(e.g. RG62)
Shielding
Max. 60 m
Burner
Terminals in the
burner compartment
2
1
1
2
2
5
5
QRA5...
3
3
4
4
Cable AGM19
7785g01e/0604
CC1N7785en
20.11.2017

Advertisement

loading