2 Precautions on Rack Installation and
Operation
2.1

Precautions on Installation and Operation

■ Securing adequate space for ventilation and maintenance
When installing the rack with CDU, secure adequate space for ventilation and maintenance.
Secure the following space.
500
Rack
Rack height
Front view
2000(42U)
Rack width 800
*1) Depth with RackCDU(WIDE) : 1490mm, without RackCDU(WIDE) : 1200mm.
*2) When you mount other than liquid cooling unit.
* Please follow the instructions if there is specified for the product.
■Ready for rack mounting stepladder
When using this rack, working in high places will occur.
Stepladder is required for mount the unit and for maintenance work.
Please be deployed in area units, such as floor unit.
Prepare the stepladder that conforms to the following specifications.
· height: 1000mm (4 stages)
· Load capacity: 150kg
· Step board size: 350 x 240mm
Space for ventilation
and maintenance
(CDU WIDE)
stabilizer
1400
*2(400)
250
[CDU wide]
Rack
Top
view
250
250
1400
800
29
1400
*2(500)
1200
Rack(+CDU WIDE)
depth *1
1490
(RACK+CDU)
1200
(RACK)
250
Front of Rack
1400
1000
1400
[UNIT:mm]