PME-500-TR basic performance test October 2 , 2009 PME-500-TR Basic Performance Test An EuroSMC training paper ®...
Page 2
These ‘switches’ are sensitive to polarity, and can be operated manually by pressing the ‘open’ or ‘close’ buttons in the PME-500-TR’s TEST menu. To check the coil control system for proper operation, you will need a small lamp, a suitable battery, a short section of conductor and a few simple steps: 1.
Page 3
1. Ensure that the PME-500-TR’s battery holds some charge or leave the unit switched off and connected to an AC outlet to re-charge for at least 15 minutes. This test takes the power from the battery, even if the unit is connected to a mains AC outlet.