If the last 24 hours of the TRANSIT/STORAGE environment
was:
Hot >72°F (22°C)
Hot >72°F (22°C)
Hot >72°F (22°C)
Unknown
IMPORTANT:
If there are signs of condensation after the recommended acclimation time has passed, allow an additional eight (8) hours to stabilize.
System components must not experience changes in temperature and humidity that are likely to cause condensation to form on or in
that system or component. Do not exceed the shipping and storage temperature gradient of 45°F/hr (25°C/hr).
To facilitate environmental stabilization, open both front and rear cabinet doors.

Steps to unpack and setup cabinet

The steps to unpack, setup and repackage the shipping material are listed in the following table:
Step
Task
1

Remove the ramp and shipping material from the cabinet

2
Remove the cabinet shipping brackets
3
#unique_10
4
Roll the cabinet down the ramp
5
Position and level the cabinet
6
Attach AC power input cords
7
Attach (optional) brackets
8
Install the lower trim strip
9
Ground the cabinet
10
Repackaging shipping material (2-piece ramp kits only)
Remove the ramp and shipping material from the
cabinet
Steps
1. Remove any boxes and other material from the cabinet sides.
Damp >30% RH
Dry <30% RH
Humid 30–45% RH
Humid 45–60% RH
Humid >60% RH
on page 5
on page 7
on page 8
on page 11
on page 12
on page 13
...and the OPERATING
environment is:
<86°F (30°C)
<86°F (30°C)
on page 3
on page 14
...then let the system or
component acclimate in the
new environment this many
hours:
8 hours
16 hours