Repackaging Shipping Material (2-Piece Ramp Kits Only) - Dell EMC 40U-P Unpacking And Setup Manual

Cabinet
Table of Contents

Advertisement

Repackaging shipping material (2-piece ramp kits
only)
About this task
Follow these steps to repackage the shipping material:
Steps
1. Lay each of the outer sleeves flat, then fold it lengthwise before collapsing the three sections, as shown:
2
1
3
CL4690
2. Stack the shipping brackets on the pallet, as shown:
1
2
3
CL4697
3. Place ramp section B upside-down on the pallet, then stack section A, right-side up.
4. Stack the two folded outer sleeves above the ramp sections.
5. Apply the two collar sections to either side of the pallet; hold them in place with the package hood.
14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents