Download Print this page

GE Evolution E9000 Series Installation, Operation And Maintenance Manual page 27

Motor control center
Hide thumbs Also See for Evolution E9000 Series:

Advertisement

I N S TA L L AT I O N , O P E R AT I O N S A N D M A I N T E N A N C E M A N U A L
31
The door cannot be opened
when the disconnect is ON
32
Removing the operating
handle mounting screw
33
Rotating the operating
handle to access the breaker
31
The disconnect is also equipped with a padlocking
provision, so that the operating handle can be
locked in the OFF position. The handle can also be
drilled to accommodate one padlock to secure it in
the ON position. In either case, the unit cannot be
withdrawn because of interference between the
padlock(s) and door.
Final commissioning: Verify that all doors are
properly latched and interlocked prior to
energizing.
Plug-in units,
no door
NEMA Size 1 FVNR
NEMA Size 2 FVNR
NEMA Size 3 FVNR
NEMA Size 4 FVNR
NEMA Size 5 FVNR
Caution: should be used when removing or
installing units consider the weight in table above.
Two persons may be required or the assistance of a
lifting devices. See page 28 for suggested lifts.
Estimated
Minimum height
weight (lbs)
(Inches)
35
12
37
12
53
18
62
24
125
36
Caution: The friction of Type 12 gasketing
can prevent the breaker disconnect
operating handle from returning to the full
ON position. Prior to servicing, confirm
breaker disconnect is in the OFF position.
Operating handle
The operating handle must be moved out of the
way to access the breaker disconnect. Make sure
that the disconnect operating handle is in the OFF
position. Open the door, then remove the mounting
screw securing the base of the handle to the side of
the unit, as shown in Figure 32. The handle can then
be rotated up and out of the way, as shown in
Figure 33, allowing access to the breaker.
32
33
27

Hide quick links:

Advertisement

loading