baltur BT 250 DSG-4T Instruction page 33

Table of Contents

Advertisement

Available languages

Available languages

TABLE OF PIPELINE FOR BT 300 DSG-4T
Pump axis
SIPHON FEED SYSTEM WITH FEED FROM THE TOP OF THE TANK
SIPHON FEED SYSTEM WITH FEED FROM THE TOP OF THE TANK
Pump axis
Pump axis
GRAVITY FEED SYSTEM
1 Tank
2 Feeding pipe
3 Wire-net fi lter
4 Pump
5 Degasifi er
1 Tank
3 Wire-net fi lter
4 Pump
6 Suction pipe
7 Return pipe
SUCTION FEED SYSTEM
SUCTION FEED SYSTEM
1 Tank
3 Wire-net fi lter
4 Pump
6 Suction pipe
7 Return pipe
10 Bottom valve
N.B. Comply with existing regulations regarding apparatus
required in the pipeline system
H - Height difference between minimum fuel tank level and pump axis.
H - Height difference between minimum fuel tank level and pump axis.
L - Total length of pipeline, including vertical lenght. Subtract 0,25 mt.
for every elbow or gate valve.
for every elbow or gate valve.
31 / 69
0006081081_2006/10
6 Suction pipe
7 Return pipe
8 Automatic fuel interception
device at burner shut off
9 Non-return valve
H
Total length meters
meters
meters
Ø = 3/4"
Ø = 3/4"
1
1
40
40
1,5
1,5
45
45
2
2
45
45
2,5
2,5
50
50
3
3
50
50
8 Automatic fuel interception device
at burner shut off
9 One-way valve
10 Bottom valve
H
Total length meters
meters
meters
Ø = 3/4"
Ø = 3/4"
1
1
40
40
1,5
1,5
45
45
2
2
45
45
2,5
2,5
50
50
3
3
50
50
Dimension P = 3,5 m. (max.)
H
Total length meters
meters
meters
Ø = 3/4"
Ø = 3/4"
0,5
0,5
34
34
1
1
29
29
1,5
1,5
24
24
2
2
19
19
2,5
2,5
14
14
3
3
9
9
3,5
3,5
3,5
3,5
Øi. 20 mm
Øi. 20 mm
40
40
45
45
45
45
50
50
50
50
Øi. 20 mm
Øi. 20 mm
40
40
45
45
45
45
50
50
50
50
Øi. 20 mm
Øi. 20 mm
34
34
29
29
24
24
19
19
14
14
9
9
3,5
3,5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bt 300 dsg-4t

Table of Contents