ENGLISH
Fig. 16
A
1. Place the gasket on the heat exchanger (Fig. 16-A) .
2. Place the heat exchanger in the fl ue outlet of the Jøtul C24.
The straight side of the heat exchanger must be aligned with
the front and back of the Jøtul C24 (Fig. 16-B).
Fig. 17
A
3. Place the gasket (A) on the fl ue pipe.
4. Place the fl ue pipe in the fl ue outlet of the heat exchanger.
(fi g. 16 C).
12
C
B
4.12 Performance check
Once the product has been assembled, always check the control
handles. These should move easily and work in a satisfactory
manner.
Fig. 18
Lukket/Closed
C
Lukket/Closed
The Jøtul C 24 is equipped with the following operating options:
Air vent (Fig. 18A)
Left position
closed
Right position
fully open
Ignition vent (Fig. 18B)
Left position
closed
Right position
fully open
Åpen/open
A
B
Åpen/open
Need help?
Do you have a question about the C 24 IT and is the answer not in the manual?
Questions and answers