Rigging procedures
9. Link the two enclosures at the front by pre-tightening a rigging screw on both sides.
10. Check that all the screws are secured and tightened (5 N.m torque).
What to do next
Securing a screen
(p.94)
84
A15i owner's manual (EN) version 1.0