Porsche 924 Workshop Manual page 227

Volume i. engine
Hide thumbs Also See for 924:
Table of Contents

Advertisement

28
Ignition System
CHECKING HALL
TRANSMITTER
Requirements:
Ignition
coil and control unit must be in perfect
operating condition.
1. Connect ignition
coil
term. 4 on ground with a
high voltage lead.
2. Connect
test lamp between term.
15
and
term
.
1.
28 -36
TCl-H Ignition System
924
3.
Test
lamp
should flicker
while operating
the starter.
If
not,
Hall transmi
tter
is
defective
and distributor
must be
replaced.
CHECKING EIS
CONTROL
UNIT (IDLE STABILIZER)
1.
Visually
inspect both plugs of EIS control unit
for
good seating of contact pins
and
corrosion.
Check 0-rings for damage and, if necessary, replace
before connecting plugs.
Printed
in
Germany

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents