6. See
Figure
6-5. The LCD will display Test-
ing PRVSS during the testing process.
Upon completion, the LCD will read Low
Sun or Making Power, depending upon
available PV voltage.
PWRcell X7602
Photovoltaics
testing PVRSS
Power:
PV Voltage:
E-total:
Figure 6-5. PVRSS Commissioning (4 of 4)
TABLE 2. PVRSS Commissioning Troubleshooting
Message
PVRSS fail:
high input
PVRSS not
configured
PVRSS count
mismatch
PVRSS fail:
low input
If the failure persists, contact the nearest Independent Authorized Service Dealer (IASD) or Generac Cus-
tomer Service at 1-888-436-3722 (1-888-GENERAC), or visit
18
-xx
115v
59.0kWh
Cause
The voltage detected with SnapRS
devices disabled is higher than
expected.
PVRSS is enabled on the optimizer,
but the SnapRSInstalld device
setting indicates no SnapRS
devices are installed.
The number of SnapRS devices
listed in the SnapRSInstalld device
setting does not match the detected
number of SnapRS devices.
The panel output voltage is too low
to accurately count the SnapRS
devices.
7. Complete steps 1-6 for each PV link in the
system.
NOTE: To verify a PV Link is working properly,
navigate to the Mod.Settings page and con-
firm the SnapRSInstalld value matches the
number of SnapRS devices connected to that
PV Link.
0W
Solution
•
•
•
Follow the instructions in the PVRSS
Commissioning with SnapRS Devices
section. See
with SnapRS Devices
Check the Mod. Settings and update the
SnapRSInstalld value to reflect the num-
ber of installed SnapRS devices.
If the failure occurs with normal exposure
to sunlight, contact the nearest Indepen-
dent Authorized Service Dealer (IASD) or
Generac Customer Service at 1-888-436-
3722 (1-888-GENERAC), or visit
www.generac.com
www.generac.com
Installation Manual for PV Link and SnapRS
Verify the SnapRS devices are
installed correctly.
Run the PVRSS self-test.
SnapRS devices have not been
installed or have failed.
PVRSS Commissioning
.
for assistance.
for assistance.
Need help?
Do you have a question about the PV Link and is the answer not in the manual?