Section 6 Operating Instructions

User Interface via Inverter

PV Link Information and control features are
available on the PWRcell inverter control
panel when REbus is energized. See the Gen-
erac PWRcell Inverter Owner's Manual for
more information.
See
To access the device page for
Figure
6-1.
each PV Link, use left or right arrow buttons
(A) on the inverter control panel to scroll
through the pages. When on a PV Link device
page, press center button (B) to enable or dis-
able the device or to modify settings. The dis-
abled/enabled
state
communication with the inverter.
NOTE: The PV Link only produces power after
the REbus DC nanogrid has been established
and the device has been enabled.
A
Figure 6-1. Inverter Control Panel
Commissioning the Rebus
System
The PV Link ships from the factory in a dis-
abled state. Each unit must be enabled from
the PWRcell inverter control panel. Once
enabled, the PV Link automatically detects the
REbus nanogrid and begins to export power
when the bus is within normal operating speci-
fications.
See the Generac PWRcell Inverter Installation
Manual for instructions on commissioning the
REbus system.
PVRSS Commissioning with
SnapRS Devices
To enable PV Link to work as a PVRSS with
SnapRS devices:
1. Press the right arrow button on the control
panel repeatedly until the device page
appears.
Installation Manual for PV Link and SnapRS
does
not
affect
B
009894
NOTE: The device page display should read
Disabled. If it does not read Disabled, press
the center button and disable the device.
2. See
Figure
6-2.
and select Mod. Settings to access device
settings and options.
3. Record the RCPn number in
and SnapRS Important
on the front cover of this manual.
PV Link S2502
Disable
Mod. Settings
Enable w/PVRSS
RCPn: 00010003XXXX
< EXIT
SCROLL > NEXT • SELECT
Figure 6-2. PVRSS Commissioning (1 of 4)
4. See
Figure
6-3. If installing a dual string
array, select Mod. Settings and update the
String Count value to 2.
PLM Channel:
Vin Startup:
String Count:
Enable PVRSS:
Cancel
Figure 6-3. PVRSS Commissioning (2 of 4)
5. See
Figure
6-4. Press the center button
and select Enable w/PVRSS to enter the
Testing PVRSS state.
PV Link S2502
Disable
Mod.
Settings
Enable w/PVRSS
RCPn: 00010003XXXX
< EXIT
SCROLL > NEXT • SELECT
Figure 6-4. PVRSS Commissioning (3 of 4)
Press the center button
Table PV Link
Information, found
Menu
off
120.0V
Commit
Menu
2
1
17

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PV Link and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

SnaprsS2502Rs801

Table of Contents