Section 4 PVRSS Compliance Guidelines

2011 NEC and Older Editions
2011 NEC and older editions do not require
PVRSS compliance.
NOTE: The PV Link will still provide 2014
NEC compliant PV Rapid Shutdown.
2014 NEC
The 2014 NEC 690.12 introduced a new
requirement for PV systems that is commonly
referred to as PV rapid shutdown.
To meet 2014 NEC compliance:
1. Install the PWRcell inverter as specified in
the Generac PWRcell Inverter Installation
Manual.
2. Install the PV Link as specified in this man-
ual.
3. The DC disconnect under the PWRcell
inverter cover labeled PV by the installer
can be used as the PVRSS initiation
device. See Shutdown in the Generac
PWRcell Inverter Installation Manual for
more information.
Rapid shutdown response time is less than 30
seconds.
Installation Manual for PV Link and SnapRS
2017 and 2020 NEC
The 2017 and 2020 NEC have PVRSS
requirements mandating the need to reduce
voltages of controlled conductors to less than
80 VDC within the array, as well as some
specification for the location of the PVRSS ini-
tiator and its labeling.
To meet 2017 and 2020 compliance:
1. The 2017 and 2020 NEC requires the
PVRSS initiator be located at a readily
accessible location outside the building.
– The DC disconnect under the PWRcell
inverter cover labeled PV by the
installer can be used as the PVRSS ini-
tiation device.
NOTE: Provide signage indicating the PVRSS
initiation device is the REbus PV DC discon-
nect located under the front cover of the
inverter.
– An externally mounted PVRSS initia-
tion device is required to be installed at
a readily accessible location when the
PWRcell inverter is installed within a
one- or two-family dwelling unit.
NOTE: Provide signage indicating where
PVRSS initiation devices are located. Note
that if the inverter is installed in the appropri-
ate outdoor location it may satisfy this require-
ment.
2. Provide signage complying with section
690.56(C) of the NEC (NFPA 70), stating
all conductors are controlled.
NOTE: Install one SnapRS to the negative
whip (-) of each PV module connected to the
PV Link.
3. Install the PV Link. See
lines
for more information.
Upon initiation of rapid shutdown, both inputs
and outputs of the PV Link are controlled to be
less than 80 VDC. Rapid shutdown response
time is less than 30 seconds, in accordance
with section 690.12 of the NEC (NFPA 70).
Installation Guide-
11

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PV Link and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

SnaprsS2502Rs801

Table of Contents