Oracle Acme Packet 6300 Hardware Installation And Maintenance Manual page 10

Table of Contents

Advertisement

Date
Revision Number
November 10, 2014
Revision 1.14
January 15, 2015
Revision 1.15
April 20, 2015
Revision 1.15
August 8, 2017
Revision 2.00
January 11, 2019
Revision 2.10
July 2020
Revision 2.20
Description
Entered a note in the Maintenance Introduction
pointing out that after you replace an SSD, you
must format it.
Corrected VCCI references.
Renamed the document to reflect the merge of
the Installation and Service manuals.
Removed Regulatory Specifications and
Certifications from the Specifications chapter.
Inserted reference to Acme Packet Platforms
Safety and Compliance Guide.
Inserted an updated Oracle copyright page.
Inserted language to confirm that Acme Packet
6300 hardware installation documentation
satisfies NEBS (Network Equipment-Building
System) requirements.
Entered a note at the end of the Startup chapter
pointing out that after you initially sign on to an
Acme Packet 6300 after installation, you must
format the solid state drive.
Adds support for Acme Packet 6350.
Adds the Oracle accessibility statement to
"About This Guide".
Updates "NIU Removal and Installation" with
new images and notes.
Updates "DC Power Cords" with information on
a new cord.
About This Guide
x

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Acme Packet 6300 and is the answer not in the manual?

This manual is also suitable for:

Acme packet 6350

Table of Contents