Download Print this page

Huawei OptiX RTN 310 Quick Installation Manual page 33

Advertisement

Installation Reference
Powering On the RTN 310 Supplied by an Indoor PI
Caution
• Before powering on the equipment, ensure that:
- The GE cable used for providing power over Ethernet
and the PI power cable have been installed.
- The indoor PI works in PSE-PD mode. If the indoor PI is
powered on and works in FORCE mode, disconnect the
input power cable from the PI and push the power output
switch of the PI to the PSE-PD side.
• Power on the equipment within 24 hours of unpacking.
• During maintenance, the power-off time of the equipment
must not be longer than 24 hours.
Power Output Mode
PSE-PD
1
Switch on the power supply device connected to the PI.
NOTE
In normal cases, the DC IN and P&E OUT indicators are
steady green. For the indicator status description, see
the Product Description.
2
Check the system indicator on the RTN 310.
System indicator
NOTE
In normal cases, the system indicator is on. For
the indicator status description, see the
Product Description.
64/65 >>
Powering On the RTN 310 Supplied by an Outdoor PI
Caution
Before powering on the equipment, ensure that:
•The P&E cable and the PI power cable are installed.
•DIP switches are set correctly, and the DIP switch for setting the
PoE mode for the used P&E port is turned to the PSE-PD side.
After setting the DIP switches, switch off the power supply. After
waiting for 6 seconds, switch on the power supply again.
• Power on the equipment within 24 hours of unpacking.
• During maintenance, the power-off time of the equipment
cannot be longer than 24 hours.
1
Switch on the power supply device connected to the PI.
POWER
P&E OUT
NOTE
In normal conditions, POWER and P&E OUT indicators are on
(green). For a description of indicator states, see the PI
installation guide.
2
Check the system indicator on the RTN 310.
System indicator
NOTE
In normal cases, the system indicator is on.
For the indicator status description, see the
Product Description.
Powering On the RTN 310 Working with the RTN 900
Caution
• Before powering on the equipment, ensure that:
- The RTN 900 has been powered on.
- The GE cable used for providing power over Ethernet has been installed.
• Power on the equipment within 24 hours of unpacking.
• During maintenance, the power-off time of the equipment must not be longer than 24 hours.
1. Use the Web LCT to enable the PoE function for the interconnected port on the EG4P board of the RTN 900.
a. In the NE Explorer, select the desired NE from the Object Tree and choose Configuration > Interface
Management > Ethernet Interface from the Function Tree.
b. Click the Advanced Attributes tab.
c. Set POE to Enabled for the port that provides power over Ethernet to the RTN 310.
d. Click Apply.
2. Check the system indicator on the RTN 310.
RTN 310
P&E port
RTN 900
L/A3 indicator
Web LCT
Power over
Ethernet indicator
NOTE
In normal cases:
•The power over Ethernet indicator of the EG4P board on the RTN 900 is steady green, and the L/A3
indicator is steady green or blinks yellow. For the indicator status description, see the OptiX RTN 900
IDU Hardware Description.
•The system indicator on the RTN 310 is on. For the indicator status description, see the Product
Description.
System
indicator
P&E ports (3/P1 and 4/P2) on the EG4P board
When a P&E port on the OptiX RTN 900 is connected to a
device other than OptiX RTN 300, the PoE function must be
disabled. Otherwise, the peer device may be damaged.

Advertisement

loading