Download Print this page

Huawei OptiX RTN 310 Quick Installation Manual page 5

Advertisement

Installing the RTN 310
Components
D
Indoor PI
Front view of the PI panel
① Power input port
② Power indicator
③ GE electrical port (connected to the peer GE equipment)
④ NMS port (reserved)
⑤ MGMT port for a P&E cable (reserved)
E
Indoor PI auxiliary mounting bracket
Mounting ear for installation in
a cabinet
Ground screw
1. One auxiliary mounting bracket can support a maximum of three
Mounting ear for
PIs.
installation in a
2. When a PI is installed on an auxiliary mounting bracket, ground
cabinet
the PI with the ground screw on the bracket.
F
USB flash drive
•The recommended USB flash drive is Netac U208 with a 4 GB
capacity.
•If a different model or capacity is required, contact your local
Huawei office.
•The appearance of a USB flash drive on the left is for
reference only.
08/09 >>
Mounting ears for
installation on a wall
⑥ Power over Ethernet and GE service port
(connected to the P&E port of the
RTN 310)
Mounting screw (used for installing an indoor
PI on an auxiliary mounting bracket)

Advertisement

loading