Commissioning

5.Commissioning
Before starting up commissioning at site, please make sure below procedures
and requirements are fully meet.
· Mounting location is meet the requirements.
· All of the electrical wiring is firmly connected, including PV wiring, Grid wiring
and Earth wiring.
· The inverter setting has been finished accordingly to local standards or
regulations.
Commissioning Procedures
· Turn on the AC switch between inverter output and the public grid;
· Turn on the DC switch on the inverter;
· Turn on the PV switch of the system.
LED Indication
POWER
Green LED
UP
DOWN
Sign
Power
On
POWER
Off
On
GRID
Off
On
FAULT
Off
GRID
Green LED
POWER
GRID
FAULT
Color
Explanation
Green
Power On
No Power
Inverter is feeding power
Green
Inverter is not feeding power at the moment
Red
Fault occurred
No fault
FAULT
Red LED
ESC
ENT