Puller Height Adjustment; (Machines With Puller); Puller Timing Adjustment - Brother DA-9280 Manual

Three needle (twin needle) feed off the arm double chain stitch
Hide thumbs Also See for DA-9280:
Table of Contents

Advertisement

10-12. Puller height adjustment (Machines with puller)
10-13. Puller timing adjustment (Machines with puller)
Adjust the height of the puller (1) so that it is 0.1 to 0.2 mm high
from the top of the needle plate (2).
Loosen the screw (3), and move the puller support (4) up or
down until the puller (1) is 0.1 to 0.2 mm above the top of the
needle plate (2).
After the adjustment, retighten the screw (3).
1535B
Make an adjustment so that, when the needle bar is down at the
lowest position, the mark [A] on the timing collar (1) is in line with
the reference line [B].
1. Turn the machine pulley toward yourself until the mark [A] on
the timing collar (1) meets the reference line [B].
2. Loosen the two set screws (2), and turn the machine pulley
toward yourself until the needle bar is lowered all the way
down.
3. Retighten the two set screws (2).
1536B
DA-9280
10. STANDARD ADJUSTMENTS
24

Advertisement

Table of Contents
loading

Table of Contents