Brother DA-9280 Manual page 33

Three needle (twin needle) feed off the arm double chain stitch
Hide thumbs Also See for DA-9280:
Table of Contents

Advertisement

11. INSTALLING OPTIONAL PARTS
4. Fill the thread cooler tank assembly (1) with the silicone oil
(6).
1539B
5. Pass the thread through the thread guide (4).
1540B
DA-9280
26

Advertisement

Table of Contents
loading

Table of Contents