INSTALLATION

Unpacking and Inspection

Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should
have received the following items inside of package:
 The unit x 1
 User manual x 1
 Software CD x 1
 Battery cable x 1
 PV connectors x 1
 Communication cable x 2
Installation
Wall mounted
Consider the following points before selecting where to install:
Do not mount the inverter on flammable construction materials.
Mount on a solid surface
Install this inverter at eye level in order to allow the LCD display to be read at all times.
The ambient temperature should be between 0°C and 55°C to ensure optimal operation.
The recommended installation position is to be adhered to the wall vertically.
For proper air circulation to dissipate heat, allow a clearance of approx. 20 cm to the side and approx. 50
cm above and below the unit.
SUITABLE FOR MOUNTING ON CONCRETE OR OTHER NON-COMBUSTIBLE SURFACE ONLY.
Please follow the steps as below to finish the installation.
Drill three holes in the marked locations on a solid surface as shown in below chart. The reference
tightening torque is 3 Nm.
Mounting the unit by screwing three screws. It's recommended to use M5 or M6 screws.
240mm
333mm
120mm