Initial Commissioning - Eaton Moeller MFD-CP4-CO Hardware And Engineering

Display/operator system for canopen
Table of Contents

Advertisement

Setting and commissioning the
device

Initial Commissioning

26
j
Danger!
The display/operator system must only be run if it is prop-
erly mounted and installed:
• The installation must comply with regulations for elec-
tromagnetic compatibility (EMC).
• MFD-CP4-CO is designed to be installed in an enclo-
sure, switch cabinet or distribution board.
• If the display/operator system is switched on, the
controlled devices should not respond in an uncon-
trolled manner, e.g. uncontrolled motor startups.
Prior to initial commissioning, the station number (NodeID)
of the MFD-CP4-CO is set as follows via the display:
Connect the power supply.
X
Press the DEL and ALT buttons simultaneously. The Setup
X
menu is displayed. The cursor is in the first line on the
NodeID parameter.
Press the OK button and select the required addresses
X
with the
Press the OK button again to save the value.
X
The next time the power supply is switched off and on the
device will try to connect to the new address.
ú
í
and
buttons.