Summary of Contents for Eaton Wright-Line TechOrganizer Corner
Page 1
C o r n e r T e c h O r g a n i z e r Tools Required -#33 (.113 dia.) Drill (Jobbers length) -Electric drill -5/32” Allen wrench (provided) -Phillips head screwdriver -Plastic mallet Corner TechOrganizer The Corner TechOrganizer can be installed on Linx Worksurfaces or appropriate industrial work benches.
Page 2
C o r n e r T e c h O r g a n i z e r #10AB x 2.25” Phillips 2. With two people, position the TechOrganizer in the flat head screws desired location on the back of the Worksurface. On a Linx Worksurface, locate the back of the frame .20”...
Page 3
T e c h O r g a n i z e r I n s t a l l a t i o n P h e n o l i c C o r n e r T e c h B e n c h TOOLS REQUIRED (1) #19 drill bit (not supplied) (1) 7/32”...
Page 4
T e c h O r g a n i z e r I n s t a l l a t i o n P h e n o l i c C o r n e r T e c h B e n c h 4.
Need help?
Do you have a question about the Wright-Line TechOrganizer Corner and is the answer not in the manual?
Questions and answers