Mounting And Installation; Oit System Overview - Pepperl+Fuchs OIT500-F113-B12-CB3 Manual

High-temperature identification system
Table of Contents

Advertisement

OIT500-F113-B12-CB3

Mounting and Installation

3
Mounting and Installation
3.1

OIT System Overview

Figure 3.1
The installation of the OIT system involves just a few steps. In addition to the Ethernet TCP/IP
interface, the device has a trigger input for an optional trigger sensor (NBB20-L2-A2-V1
inductive sensor shown for illustrative purposes).
The initial commissioning sequence is described in the following diagram. Each box indicates
one of the following subsections:
Mounting
the OIT system
Specifying the operating
distance
Setting the lighting angle
Mounting and aligning
the device
Mounting the code
sheet
Figure 3.2
Note!
Before carrying out the initial commissioning of an OIT system, you must install the latest
version of the Vision Configurator software on your PC/laptop. An up-to-date description of
the Vision Configurator software can be found on our website at http://www.pepperl-
fuchs.com.
OIT system overview
Establishing
an electrical
connection
Connecting the power
supply
Connecting the network
cable
Optional: Connecting
a trigger sensor
Schedule for initial commissioning
PLC
Setting up
Connecting
Windows
the OIT system
network
to the software
communication
Displaying the
IP address of the device
Setting the IP address
of the PC
15

Advertisement

Table of Contents
loading

Table of Contents