Preparation; Installation Location; Minimum Clearances; Water Installation - STIEBEL ELTRON DHB-E 13 LCD AU Operation And Installation

Electronically controlled comfort instantaneous water heater
Hide thumbs Also See for DHB-E 13 LCD AU:
Table of Contents

Advertisement

INSTALLATION

Preparation

Load shedding relay (LR 1-A)
The load shedding relay for installation in the distribution board
provides priority control for the instantaneous water heater when
other appliances, such as electric storage heaters, are being op-
erated simultaneously.
Central thermostatic valve (ZTA 3/4)
Use the thermostatic valve for central premixing when, for ex-
ample, operating an instantaneous water heater with preheated
water. For use in shower operation, the valve must be set to a
maximum of 55 °C and internal anti-scalding protection must be
set to 43 °C.
9.
Preparation
9.1

Installation location

Material losses
!
Install the appliance in a room free from the risk of frost.
f Always install the appliance vertically and near the draw-off
f
point.
The appliance is suitable for undersink and oversink installation.
Undersink installation
1 Cold water inlet
2 DHW outlet
Oversink installation
2
1 Cold water inlet
2 DHW outlet
Note
f Mount the appliance on the wall. The wall must have
f
sufficient load bearing capacity.
8
| DHB-E LCD AU
1
2
1
9.2

Minimum clearances

≥50
f Maintain the minimum clearances to ensure trouble-free op-
f
eration of the appliance and facilitate maintenance work.
9.3

Water installation

f Flush the water line thoroughly.
f
Taps/valves
Use appropriate pressure taps. Open vented taps are not per-
missible.
Permissible water line materials
- Cold water inlet line:
Pipes made from galvanised steel, stainless steel, copper or
plastic
- DHW outlet line:
Stainless steel pipe, copper pipe or plastic pipe
Material losses
!
If plastic pipework systems are used, take into account
the maximum inlet temperature and the maximum per-
missible pressure.
Flow rate
f Ensure that the flow rate for switching on the appliance is
f
achieved.
f Increase the water line pressure if the required flow rate
f
is not achieved when the draw-off valve is fully open. If
the flow rate is still not achieved, remove the flow limiter
(see chapter "Installation / Installation / Removing the flow
limiter").
≥50
www.stiebel-eltron.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dhb-e 18 lcd auDhb-e 27 lcd au

Table of Contents