Vent Sidewall Installation - Vermont Castings BHDR36 RN Installation Instructions & Homeowner's Manual

Direct vent; rear vent
Table of Contents

Advertisement

VENT SIDEWALL INSTALLATION

*IMPORTANT* Minimum clearance between vent pipes
and combustible materials is one (1") inch (25 mm) on
bottom, sides and top.
Vent Starter Kit 7TDVSK, plus Transition
Elbow 7TDVRT90 must be used in
Vertical Sidewall installations.
pipe must be centred inside the 7" pipe
coming off the 7TDVRT90 transition
elbow.
STEP 1
Locate vent opening on the wall. It may be necessary to first
position the fireplace and measure to obtain hole location.
Depending on whether the wall is combustible or non-
combustible, cut opening to size. Fig. 48 or 50.
(For combustible walls first frame in opening. Fig. 49).
Vent Opening —
Combustible Wall
(240mm)
9-
9-
"
3/8
(240mm)
Fig. 48
Vent Opening —
Noncombustible Wall
"
7-
1/2
(190mm)
Fig. 50
COMBUSTIBLE WALLS (Fig. 48): Cut a 9-3/8"H x 9-3/8"W (240
mm x 240 mm) hole through the exterior wall and frame as shown
(Fig. 49).
NON-COMBUSTIBLE WALLS (Fig. 50): Hole opening must be
7.5" (190 mm) in diameter.
The 4"
"
3/8
(framing detail)
Fig. 49
STEP 2
Fig. 51. Measure wall thickness and cut adjustable zero
clearance sleeve parts to proper length (MAXIMUM 12").
Adjust sleeve to minimum (9-3/8" x 9-3/8") and attach to
firestop with #8 sheet metal screws (supplied). Install
STEP 2
firestop assembly.
Zero clearance sleeve is only required for
combustible walls.
#8
SCREWS(2)
ADJUSTABLE ZERO
Fig. 51
CLEARANCE SLEEVE
STEP 3
(Fig. 52) Apply a bead of high temperature sealant to the
inner and outer flue collars of the fireplace and using
appropriate venting component(s) attach to fireplace with
three (3) screws. Follow with the installation of the inner
and outer elbow. Again secure joints with three (3) sheet
metal screws. Wipe off any excess high temperature
sealant.
ENSURE PIPES
ARE CONCENTRIC
STEP 4
(Fig. 53) Measure the horizontal length requirement plus
1-1/2" overlap, i.e. from the elbow to the outside wall finish
plus 1-1/2" (or the distance required if installing a second
90º elbow).
Always
install
horizontal
venting
on a
level
plane.
- 22 -
#8
Maximum Length
SCREWS(2)
12" (294mm)
ADJUSTABLE
ZERO CLEARANCE
SLEEVE
#8
SCREWS(2)
FIRESTOP
FIRESTOP
X
7TDVRT90
BEAD OF
SEALANT
(IF NECESSARY)
X
Fig. 52
Fig. 53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bhdr36 rp

Table of Contents