Table Of Contents; Product Description And Intended Use; Installation; Tests Prior To Installation - Nice TUB4000 Instructions And Warnings For Installation And Use

For industrial sliding gates
Table of Contents

Advertisement

TUB4000
ENGLISH
Instructions translated from Italian
GENERAL WARNINGS: SAFETY - INSTALLATION - USE ...............................................1
1 - PRODUCT DESCRIPTION AND INTENDED USE ......................................................3
2 - INSTALLATION...........................................................................................................3
2.1 - Tests prior to installation................................................................................................................. 3
2.2 - Product application limits ............................................................................................................... 3
2.3 - Typical system ............................................................................................................................... 4
2.4 - Installation of the gear motor ........................................................................................................ 4
2.5 - Installation of the various devices to the control unit ..................................................................... 4
3 - ELECTRICAL CONNECTIONS ...................................................................................5
4 - TESTING AND COMMISSIONING ..............................................................................7
4.1 - Testing ........................................................................................................................................... 7
5 - INTEGRATED CONTROL UNIT DPRO500 .................................................................8
5.1 - Product description and intended use ........................................................................................... 8
6 - INSTALLATION...........................................................................................................8
6.1 - Tests prior to installation................................................................................................................. 8
6.2 - Product application limits ............................................................................................................... 8
6.3 - Installation of the control unit ......................................................................................................... 8
7 - ELECTRICAL CONNECTIONS ...................................................................................9
7.1 - Connecting the three-phase power supply cable .......................................................................... 9
7.2 - Connecting the single-phase power supply cable .......................................................................... 9
7.3 - Changing the power supply through the jumper ............................................................................ 9
7.4 - Description of the electrical connections: power supply, safety and control devices,
and accessories ............................................................................................................................ 9
7.5 - Electrical connections of the control unit ..................................................................................... 10
7.6 - STOP SAFETY EDGE Input ........................................................................................................ 12
7.7 - Connecting a radio receiver ......................................................................................................... 12
7.8 - Initial startup and electrical connections test ................................................................................ 12
7.9 - Total deletion of the control unit memory ..................................................................................... 12
7.11 - Operating modes ....................................................................................................................... 13
7.12 - Oview programming unit ........................................................................................................... 13
8 - TESTING AND COMMISSIONING ............................................................................14
8.1 - Testing ......................................................................................................................................... 14
8.2 - Commissioning ............................................................................................................................ 14
FOR LEAVES MOVING IN OPPOSITE DIRECTIONS ................................................14
10 - FURTHER DETAILS AND DIAGNOSTICS ...............................................................15
10.1 - Further details ........................................................................................................................... 15
10.1.1 - Signals when switching ON .................................................................................................... 15
10.1.2 - Other functions ....................................................................................................................... 15
10.2 - Diagnostics ............................................................................................................................... 16
11 - BASIC TROUBLESHOOTING.................................................................................16
12 - PRODUCT DISPOSAL ...........................................................................................17
13 - TECHNICAL SPECIFICATIONS .............................................................................. 17
CE DECLARATION OF CONFORMITY...........................................................................18
USER GUIDE (detachable insert) ...................................................................................19
1
Before performing any type of operation or
procedure, read carefully the general instructions
(page 1) and the application limits (paragraph 2.2)
1

PRODUCT DESCRIPTION AND INTENDED USE

TUB4000 is a sliding gate gear motor of significant dimension for industrial use,
with built-in control unit DPRO500 and is also prearranged for the inclusion of
NICE receivers.
The gear motor, which functions electrically, can be disengaged by means of a
key, thereby allowing the gate to be opened manually.
CAUTION! - All uses other than the intended use described and use
in environmental conditions other than those described in this manual
should be considered improper and forbidden!
2

INSTALLATION

The TUB4000 must be installed exclusively by qualified technical
personnel in compliance with current laws, standards and regulations,
and with the instructions provided in this manual.

2.1 - Tests prior to installation

Before proceeding with installation, check the condition of the product com-
ponents, suitability of the selected model and conditions of the intended instal-
lation environment:
• Check that all the materials are in good working order and suited to the
intended use.
• Check that all conditions of use fall within the "application limits" of the
product (paragraph 2.2) and the value limits shown in the "Product technical
characteristics".
• Check that the installation location is compatible with the overall dimensions
of the product (Fig. 1).
• Check that the surface chosen for installing the product is solid and can
ensure stable attachment.
• Make sure that the installation area is not subject to flooding; if necessary, the
product may be installed, appropriately raised above ground level.
• Check that the space around the product allows safe and easy access.
• Check that all electrical cables to be used belong to the type listed in Table 2.
• Check that the automation has mechanical stops in both the opening and
closing phases.

2.2 - Product application limits

The data relative to the TUB4000 performances is indicated in Chapter 13
("Technical specifications") and is the only data that allows for correctly deter-
mining whether the product is suitable for its intended use.
In general, TUB4000 is able to automate gates weighing up to 4,000 kg or up
to 30 m long, according to the data shown in Table 1 below.
Length of leaf in metres
Up to 5
5÷10
10÷15
15÷20
20÷25
25÷30
Graphic represen-
tation of the cycles
40
per hour in relation
35
to the length of the
30
gate leaf.
25
20
15
10
5
0
0
IMPORTANT!
TABLE 1
Maximum cycles/hour
42
21
14
10
8
7
10
15
20
L [m]
25
30
English - 3

Advertisement

Table of Contents
loading

Table of Contents