Installing the RTN 380e
2
Installing the RTN 380e at the Edge of a Mobile Backhaul Network (Outdoor PI Required)
Retain removed caps for future use.
1.
Cover unused ports with caps/PG covers.
2.
Before installing the RTN 380e, remove the protective cover and film on the antenna port. Otherwise, the signal transmission will be affected.
3.
Different methods can be used to change the polarization direction of antennas. If the method provided in this document is not suitable for the type of antenna you have, use the method provided in the installation manual delivered with your antennas.
4.
The polarization direction of antennas is vertical by default. If the planned polarization direction is horizontal, change the polarization direction to horizontal.
5.
If an antenna with a diameter of 0.2 m, 0.3 m or 0.6 m is used in a direct mount scenario, you may install the RTN 380e on the antenna and then hoist them both into position on the tower.
6.
Before installing a cable, bind the cable section that links the cable connector to the pole. This will protect the cable connector from damage. Be sure that the length of cable running from the binding point to the RTN 380e is sufficient to attach the cable connector to
the Ethernet service port on the RTN 380e.
Installation procedure
1
Follow the antenna use instructions to
install the antenna.
2
Optional
: Change the polarization direction
of the antenna to horizontal.
Apply petroleum jelly around the exterior
3
side of the feed.
4
Install the RTN 380e on the antenna.
Install the PGND cable of the
5
RTN 380e.
6
Optional
: Install an outdoor fiber.
• Install an outdoor fiber on the RTN 380e.
• Lay out the outdoor fiber.
•Attach a yellow outdoor label to the
fiber according to the plan.
•Moistureproof the fiber.
7
Install a GE cable.
•Install the GE cable.
• Select a ground point for the GE cable.
• Install the ground clip.
• Lay out the GE cable.
•Attach a yellow outdoor label to the
cable according to the plan.
8
Install a PI and install cables on the PI.
For the installation method, see the PI
installation guide.
9
Waterproof the ground clip and do anti-
corrosion treatment for GE ports.
10
Check the installation.
18/19 >>
1 to 4
•The GE(o) port and COMBO port can
transmit/receive GE (optical) services.
•The GE(e) and P&E port can transmit/receive GE
(electrical) services.
•The RTN 380e provides power over Ethernet
through the P&E port.
Connected to one GE (optical)
service
8
11
Connected to the power supply device
GE(o)
P&E
6
7
Grounded through
the ground clip
GE1
P&E1
Connected to one FE/GE
(electrical) service
Site commissioning procedure
Power on the RTN 380e.
11
Load NE data by using a USB
12
flash drive.
Use the Web LCT to
13
load NE data.
Align antennas.
14
5
Grounded through
the ground clip