OLG Team Boardroom Table Twin Span Installation Manual

OLG Team Boardroom Table Twin Span Installation Manual

Advertisement

Team Boardroom
Table Twin Span
Installation Guide

TOOLS REQUIRED:

Powered screwdriver.
myolgoffice.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Team Boardroom Table Twin Span and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for OLG Team Boardroom Table Twin Span

  • Page 1 Team Boardroom Table Twin Span Installation Guide TOOLS REQUIRED: Powered screwdriver. myolgoffice.com...
  • Page 2 Team Boardroom Table Twin Span INSTALLATION GUIDE COMPONENTS Leg x6 Adjustable Foot x6 Leg Cable Cover x6 Rail Lengths x4 Rail Widths x3 2 Way Connector x4 2 Way Connector Cap x4 3 Way Connector x2 3 Way Connector Cap x2...
  • Page 3 Team Boardroom Table Twin Span INSTALLATION GUIDE Slide the 2 way and 3 way connectors over each leg, and securely lock into place Loosely connect the longer M8x20mm dome head bolt and slot nut through the using M8x20mm cap head bolts.
  • Page 4 Team Boardroom Table Twin Span INSTALLATION GUIDE Ensure the worksurface is centered over the frame. Pre-drill holes in the Conceal any power box cables using the magnetic leg cable covers. worksurface. Fully tighten all M5x20mm self tapping screws through each leg and rail spacer bracket into the 25mm worksurface.

Table of Contents