Team Table 4 Leg Installation Guide TOOLS REQUIRED: Powered screwdriver. myolgoffice.com...
Page 2
Team Table 4 Leg INSTALLATION GUIDE COMPONENTS Leg x4 Adjustable Foot x4 Leg Cable Cover x4 Rail x4 2 Way Connector x4 2 Way Connector Cap x4 Table Top x1 SCREWS 8 M8x12mm Dome Head x8 9 M8x20mm Cap Head x4 10 M5x20mm Self Tapping x8 myolgoffice.com...
Page 3
Team Table 4 Leg INSTALLATION GUIDE Securely connect legs to rails lengths using the shorter M8x20mm dome head Slide the 2 way connectors over each leg, and securely lock into place using bolts. M8x20mm cap head bolts. Ensure the worksurface is centered over the frame. Pre-drill holes in the Securely connect legs to rails widths using the shorter M8x20mm dome head worksurface.
Page 4
Team Table 4 Leg INSTALLATION GUIDE Conceal any power box cables using the leg cable covers. myolgoffice.com...