Download Print this page

Midea ECOHEAT Series User Manual page 9

Hide thumbs Also See for ECOHEAT Series:

Advertisement

The installation position of neutral line (blue), live line (brown/red) and earth line
(green/yellow) should be corresponding to the other end of the wiring terminals.
3.3 Water Heater Installation
Determine installation position of the unit according to length of power cord / position
of circuit breaker (Distance between bottom and floor should be ≥1.6m).
Make sure the distance between the unit and surrounding wall is not less than 300mm, to
have enough space for maintenance purposes.
Determine the position of four fixing screws (attached with the unit), make four holes with
corresponding depth in the wall by means of a drill and drive a wall plug into the hole.
Drive in the screws on the top and ensure certain distance between screw head and wall
(See Fig.1)
Mount the unit on the wall and tighten with two screws at bottom, connect the wires and
install top cover with the screws.
3.4 Plumbing Connection
Water valve with filter should be installed at water inlet of the unit, sealing ring with filter
should be used at end face. (See Fig.2).
A flexibe shower hose should be connected to the water outlet and shower head. The
attached sealing ring should be used at end face.
!
Metallic / chromed hose and conductive control valve shall not be used.
NOTE
WARNING
8
170
275
(Fig.1)

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Ecoheat fp-67wtr380wmtm-w1Ecoheat fp-67wtr380wmth-b1