Mayline 5 COLUMN CRNR XR BASE Assembly Instructions

Advertisement

NOTE: Please count and inspect all pieces before disposing of any carton or packing materials.

COMPONENTS:

REF. #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
HARDWARE BAG (PART No. A8180) *For individual item, order by part number
REF. #
E1
E2
E3
E4
E5
E6
E7
E8
E9
E10

OPTIONAL HARDWARE

REF. #
QTY.
16
1-2
I908
REV. 02
06-2016
ASSEMBLY INSTRUCTIONS
5 COLUMN CRNR XR BASE
When ordering components, specific size information may be required.
Contact a Mayline Customer Service Representative.
QTY.
DESCRIPTION
5
LIFT ACTUATOR
2
XR FOOT, 30"
1
XR FOOT, 14"
1
ACT. SUPPORT, LEFT
1
ACT. SUPPORT, RIGHT
1
BRACKET ASM., CORNER
1
CHANNEL CROSS
3
TOP PLATE
2
TOP PLATE, 14"
1
CONTROL BOX, 2 LEG
1
CONTROL BOX, 3 LEG
2
MEMORY SWITCH
2
MAIN CABLE
2
1000mm MOTOR CABLE
3
2500mm MOTOR CABLE
QTY.
DESCRIPTION
40
M6 X 16mm SCREW
40
STAR WASHER
6
GLIDE
8
#10 X 3/4 SCREW
28
#10 x 1" SCREW
4
#6 X 5/8 SCREW
12
1/4-20 X 1/2 SCREW
12
1/4-20 KEPS NUT
8
CABLE CLAMP
4
#8 x 1.75" SCREW
DESCRIPTION
PART No.
Anti-Collision Dongle
PART No.
Z460
A8174
A7299
A8176
A8177
A7292
520CC** (50"), 520CC**01 (40")
B6969
B8498
Z537
Z538
Z463
Z467
Z464
Z466
PART No.
X419
W29
Q607
X11
X12
X10
X352
T126
F191
X533
Z498
(1)
1-800-822-8037
**Denotes Color

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 5 COLUMN CRNR XR BASE and is the answer not in the manual?

Questions and answers

Summary of Contents for Mayline 5 COLUMN CRNR XR BASE

  • Page 1 ASSEMBLY INSTRUCTIONS 5 COLUMN CRNR XR BASE NOTE: Please count and inspect all pieces before disposing of any carton or packing materials. When ordering components, specific size information may be required. COMPONENTS: Contact a Mayline Customer Service Representative. 1-800-822-8037 REF. # QTY.
  • Page 2 1. Place two Lift Actuators Columns (1) upside down with the cord toward the floor with support clips are facing inward. CAUTION: Make sure strain relief is snapped into place on actuator..Do not pinch Cord Assembly. 2. Position the 30" XR Foot (2) over Columns. Note: Direction does not matter.
  • Page 3 8. Attach Top Plates (8), (9) to each Actuator Column as shown with four M6 x 16 mm Screws (E1) and Star Washers (E2). 9. Attach the Cross Channels (7) to the Actuator Support Channel Brackets (3), (4) and Corner Bracket (6) and with 1/4-20 X 1/2 Screws (E7) and 1/4-20 KEPS Nuts (E8).
  • Page 4 ATTENTION: MAYLINE includes screws for the installation of a Work Surface with a minimal thickness of 1 inch (25.4mm). NOTE: a) #10 x 3/4" Screws (E4) are provided for Cable Clamp installation only. b) #10 x 1" Screws (E5) are provided for Work Surface attachment only.
  • Page 5 15. Attach Anti Collision Dongle Option (when ordered). To install the Anti Collision Dongle (16), simply plug the dongle into one of the two control (switch) ports on the Control Box (10,11). The function is only active when the dongle is mounted - if you remove the dongle you disable the function. Note: Situations where anti-collision does not work.

Table of Contents